CFB Boiler Pressure Parts for Slovakia

15-01-2026


This is the Mondi circulating fluidized bed project, with the end user being Ruzomberok. In this project, our company was responsible for manufacturing Water Cooled Separator, Furnace Water Walls and Grid for a 130MW circulating fluidized bed boiler. The products were manufactured from July 2025 to January 2026, successfully shipped from our facility in December 2025 and January 2026, and ultimately arrived at the project site in Slovakia.


See more news