Reference List
Boiler Projects Summary
BOILER TYPE |
AMOUNT |
SIZE |
LOCATION (STANDARD) |
||||||
Largest |
Smallest |
China (GB) |
Japan (METI) |
Asia (ASME+Local) |
America (ASME) |
Europe (PED+EN/ ASME) |
Australia (ASME) |
||
| Circulating Fluidized Bed | 129 |
550MW |
5MW |
34 |
34 |
50 |
8 |
3 |
- |
| Pulverized Coal | 22 |
730MW |
200MW |
12 |
- |
5 |
5 |
- |
- |
| HRSG | 25 |
400T/Hr |
180T/Hr |
3 |
- |
1 |
21 |
- |
- |
| Package Boiler | 13 |
135T/Hr |
40T/Hr |
5 |
- |
2 |
6 |
- |
- |
| SD / MD Boiler | 6 |
260T/Hr |
220T/Hr |
3 |
- |
- |
3 |
- |
- |
| Wasted Heat Boiler | 5 |
310T/Hr |
310T/Hr |
- |
- |
2 |
1 |
1 |
1 |
| Grate Boiler | 6 |
245T/Hr |
11.7MW |
- |
1 |
- |
3 |
2 |
- |
| BFB Boiler | 7 |
10MW |
20T/Hr |
6 |
1 |
- |
- |
- |
- |
| Waste To Energy | 5 |
42.3T/H |
15T/Hr |
- |
3 |
1 |
- |
1 |
- |
| Recovery Boiler | 3 |
13,000 tds/d |
2,100 tds/d |
- |
- |
- |
2 |
1 |
- |
| Replacement Parts | 340 |
1,300MW |
30T/Hr |
52 |
15 |
73 |
189 |
11 |
- |
CFB Boiler
PROJECT NAME |
BOILER SIZE |
UNIT AMT. |
LOCATION |
STANDARD |
YEAR BUILT |
| Samcheok | 550MW |
4 |
Korea |
ASME |
2012, 2013 |
| MPGC Phase 2 (Mariveles 2) | 340MW |
2 |
Philippines |
ASME |
2024, 2025 |
| Dominion | 330MW |
2 |
USA |
ASME |
2008, 2009 |
| Cleco | 300MW |
2 |
USA |
ASME |
2006 |
| Seagull | 300MW |
1 |
Korea |
ASME |
2014 |
| Teesside | 299MW |
1 |
UK |
PED, EN |
2017 |
| Jacksonville | 275MW |
2 |
USA |
ASME |
2000 |
| Mong Duong I | 250MW |
4 |
Vietnam |
ASME |
2012, 2013 |
| Soma Kolin | 225MW |
2 |
Turkey |
PED, ASME |
2014 |
| Maokhe | 220MW |
2 |
Vietnam |
ASME |
2010 |
| Vuosaari VuC | 220MW |
1 |
Finland |
PED, EN |
2020, 2021 |
| TW Biomass | 173MW |
1 |
Korea |
ASME |
2024, 2025 |
| TVEP | 150MW |
2 |
Philippines |
ASME |
2015 |
| Glow | 115MW |
1 |
Thailand |
ASME |
2007 |
| AEI | 112MW |
1 |
Japan |
METI |
2019, 2020 |
| Sendai | 112MW |
1 |
Japan |
METI |
2023 |
| Gwangyang | 110MW |
2 |
Korea |
ASME |
2022 |
| SEC210 | 105MW |
1 |
Philippines |
ASME |
2017 |
| Dangjin2 | 105MW |
1 |
Korea |
ASME |
2018 |
| Alto | 100MW |
1 |
Philippines |
ASME |
2013 |
| Kalsel | 100MW |
2 |
Indonesia |
ASME |
2015, 2016 |
| CGN | 100MW |
1 |
Korea |
ASME |
2018 |
| S1 Plant | 100MW |
1 |
Korea |
ASME |
2019 |
| Daegu | 78MW |
1 |
Korea |
ASME |
2014 |
| TS-7 | 75MW |
1 |
Japan |
METI |
2023, 2024 |
| TCC | 50MW |
1 |
Taiwan, China |
ASME |
1999 |
| XNL | 50MW |
3 |
China |
GB |
2003 |
| VND | 50MW |
2 |
Vietnam |
ASME |
2003 |
| Sulut | 50MW |
2 |
Indonesia |
ASME |
2022 |
| Jyvaskyla | 570T/Hr |
1 |
Finland |
PED, EN |
2007 |
| Nihon | 475T/Hr |
1 |
Japan |
METI |
1999 |
| TUAS | 450T/Hr |
2 |
Singapore |
MOM |
2011 |
| Jiahua | 450T/Hr |
3 |
China |
GB |
2012 |
| Gunsan | 435T/Hr |
1 |
Korea |
ASME |
2016 |
| MMPC I | 420T/Hr |
2 |
China |
GB |
2005 |
| GPC | 420T/Hr |
2 |
China |
GB |
2006 |
| TPC | 420T/Hr |
3 |
China |
GB |
2007 |
| Hanwha | 420T/Hr |
3 |
Korea |
ASME |
2007 |
| Labuhan | 420T/Hr |
2 |
Indonesia |
ASME |
2007 |
| MMPC II | 420T/Hr |
2 |
China |
GB |
2008 |
| Rio-Turbio | 420T/Hr |
2 |
Argentina |
ASME |
2009 |
| Zhenhai I | 410T/Hr |
2 |
China |
GB |
1998 |
| Zhenhai II | 410T/Hr |
2 |
China |
GB |
2002 |
| KMH2 | 400T/Hr |
2 |
Korea |
ASME |
2012 |
| AWEP | 375T/Hr |
1 |
Japan |
METI |
2016, 2017 |
| Wuhan | 360T/Hr |
3 |
China |
GB |
2010 |
| Jinshan | 310T/Hr |
1 |
China |
GB |
2003 |
| Yanshan | 310T/Hr |
2 |
China |
GB |
2005 |
| Qingdao | 310T/Hr |
2 |
China |
GB |
2006 |
| Quanzhou | 310T/Hr |
2 |
China |
GB |
2008 |
| Ycogen YG | 260T/Hr |
1 |
Korea |
ASME |
2012 |
| ATB | 260T/Hr |
1 |
Japan |
METI |
2021, 2022 |
| IMH | 260T/Hr |
1 |
Japan |
METI |
2021 |
| MMP | 260T/Hr |
1 |
Japan |
METI |
2022 |
| SKBP | 260T/Hr |
1 |
Japan |
METI |
2022, 2023 |
| OGT | 255T/Hr |
1 |
Japan |
METI |
2020, 2021 |
| HENC | 250T/Hr |
2 |
Korea |
ASME |
2008 |
| Merak | 250T/Hr |
2 |
Indonesia |
ASME |
2011 |
| SHP | 245T/Hr |
1 |
Japan |
METI |
2015 |
| NEH | 245T/Hr |
1 |
Japan |
METI |
2021 |
| MBPG | 240T/Hr |
1 |
Japan |
METI |
2017, 2018 |
| NPF | 230T/Hr |
1 |
Japan |
METI |
2005 |
| NPI | 230T/Hr |
1 |
Japan |
METI |
2006 |
| Liaohe | 220T/Hr |
1 |
China |
GB |
2002 |
| Jiujiang | 220T/Hr |
2 |
China |
GB |
2010 |
| MBP | 205T/Hr |
1 |
Japan |
METI |
2014 |
| YFY Chiutang | 200T/Hr |
1 |
China |
GB |
2009 |
| YFY Yangzhou | 200T/Hr |
1 |
China |
GB |
2012 |
| DO II | 200T/Hr |
1 |
Japan |
METI |
2014 |
| HKP | 195T/Hr |
1 |
Japan |
METI |
2005 |
| SMP | 195T/Hr |
1 |
Japan |
METI |
2003 |
| NDT | 180T/Hr |
1 |
Japan |
METI |
2006 |
| CDY | 175T/Hr |
1 |
Japan |
METI |
2017, 2018 |
| SSKP | 170T/Hr |
1 |
Japan |
METI |
2016 |
| TGP | 140T/Hr |
1 |
Japan |
METI |
2015 |
| ONC | 130T/Hr |
1 |
Japan |
METI |
2005 |
| OGE | 100T/Hr |
1 |
Japan |
METI |
2014 |
| CLC | 90T/Hr |
1 |
Taiwan, China |
ASME |
2020 |
| UNA | 81T/Hr |
1 |
Japan |
METI |
2014 |
| TPI | 60T/Hr |
1 |
Japan |
METI |
2006 |
| GBF | 25T/Hr |
1 |
Japan |
METI |
2014 |
| GEH | 25T/Hr |
1 |
Japan |
METI |
2014 |
| KHK | 25T/Hr |
1 |
Japan |
METI |
2014 |
| MSM | 25T/Hr |
1 |
Japan |
METI |
2014 |
| BPS | 25T/Hr |
1 |
Japan |
METI |
2014 |
| BPN | 25T/Hr |
1 |
Japan |
METI |
2015 |
| MTE | 25T/Hr |
1 |
Japan |
METI |
2022 |
Total |
129 |
PC Boiler
PROJECT NAME |
BOILER SIZE |
UNIT AMT. |
LOCATION |
STANDARD |
YEAR BUILT |
| Longview | 730MW OTU |
1 |
USA |
ASME |
2008 |
| Hanfeng | 660MW AF |
2 |
China |
GB |
1998 |
| Quezon | 480MW |
1 |
Philippines |
ASME |
1997 |
| Springerville | 400MW |
2 |
USA |
ASME |
2007 |
| Yangcheng | 350MW AF |
6 |
China |
GB |
1999 |
| Rizhao | 350MW |
2 |
China |
GB |
1997 |
| Jiujiang | 350MW |
2 |
China |
GB |
1999 |
| Nghi Son | 300MW AF |
2 |
Vietnam |
ASME |
2012 |
| Cusmo | 300MW |
1 |
USA |
ASME |
2008 |
| Thai Binh | 300MW AF |
2 |
Vietnam |
ASME |
2014, 2015 |
| City of Springfield | 200MW |
1 |
USA |
ASME |
2006 |
Other Boiler
BOILER TYPE |
PROJECT NAME |
LOCATION |
BOLIER SIZE |
UNIT AMT. |
YEAR BUILT |
| Package Boiler | Kodak |
China |
40T/H |
2 |
1998 |
Marcus Hook |
USA |
125T/H |
4 |
2001 |
|
Pertamina |
Indonesia |
125T/H |
1 |
2003 |
|
BASF |
USA |
115T/H |
2 |
2006 |
|
Petronas |
Malaysia |
57T/H |
1 |
2018 |
|
|
Invista |
China |
135T/H |
3 |
2020-2021 |
|
| SD Boiler | Immingham |
UK |
- |
2 |
2002 |
Secco |
China |
220T/H |
3 |
2004 |
|
| MD Boiler | YCI |
USA |
260T/H |
1 |
2017 |
| HRSG | Huizhou Nanhai |
China |
- |
1 |
2003 |
Qishuyan |
China |
390T/H |
2 |
2005 |
|
PPN |
India |
300T/H |
1 |
2000 |
|
Sabine |
USA |
400T/H |
2 |
2000 |
|
Kendall |
USA |
310T/H |
4 |
2001 |
|
Orion |
USA |
180T/H |
3 |
2001 |
|
Intergen |
USA |
375T/H |
5 |
2002 |
|
Marcus Hook |
USA |
310T/H |
3 |
2002 |
|
Mountainview |
USA |
310T/H |
4 |
2002 |
|
| Waste Heat Boiler | Port Pirie |
Australia |
- |
1 |
2015 |
Suncoke |
USA |
310T/H |
1 |
2017 |
|
Enefit |
Estonia |
7446 h/a |
1 |
2021-2022 |
|
Chiyoda Manyar Smelter (FSF) |
Indonesia |
80000 m3n/h |
1 |
2021-2022 |
|
Chiyoda Manyar Smelter (FCF) |
Indonesia |
31000 m3n/h |
1 |
2021-2022 |
|
| Grate Boiler | Fibrominn |
USA |
222T/H |
1 |
2005 |
GRP Franklin |
USA |
245T/H |
1 |
2017 |
|
GRP Madison |
USA |
245T/H |
1 |
2017 |
|
Cubillos |
Spain |
- |
1 |
2018 |
|
Miyazaki |
Japan |
11.7MW |
1 |
2023-2024 |
|
Acor-ENSO |
Spain |
80MW |
1 |
2024-2025 |
|
| BFB Boiler | Bailonggang |
China |
20T/H |
6 |
2018 |
BPSI Ikoma |
Japan |
10MW |
1 |
2022-2023 |
|
| Waste To Energy | Sharjah |
UAE |
42.3T/H |
1 |
2019 |
MHIEC Nagasaki |
Japan |
16.6T/H |
2 |
2023-2024 |
|
MHIEC Yokohama |
Japan |
15T/H |
1 |
2023-2024 |
|
Tilbury |
UK |
39T/H |
1 |
2025 |
|
| Recovery Boiler | Bracell Star |
Brazil |
13,000 tds/d |
1 |
2019-2020 |
Klabin Puma 2 |
Brazil |
3,300 tds/d |
1 |
2019-2020 |
|
Navigator Setubal |
Portugal |
2,100 tds/d |
1 |
2023-2024 |
Boiler Replacement Parts
CUSTOMER |
PLANT /UNIT |
LOCATION |
BOLIER SIZE |
SCOPE |
YEAR BUILT |
| Fortum | Liaohe |
China |
220T/Hr |
Coil, HD |
2002 |
| CLP | CLP |
Hong Kong |
- |
Tee Pipe |
2002 |
| HKE | HKE |
Hong Kong |
- |
RH Loop, Spacer |
2003 |
| CLP | CLP Power |
Hong Kong |
- |
Tube |
2004 |
| HKE | HKE |
Hong Kong |
- |
Panel |
2004 |
| Duke Energy (Cinergy) | Gibson #1 |
USA |
630MW |
Economizer |
2004 |
| Duke Energy (Cinergy) | Cayuga #1 |
USA |
300MW |
Superheater |
2004 |
| Duke Energy (Cinergy) | Cayuga#1 |
USA |
300MW |
Economizer |
2004 |
| Duke Energy (Cinergy) | East Bend #2 |
USA |
669MW |
Superheater |
2004 |
| AEP | Tanners Creek#1 |
USA |
- |
Cyclone, RET & Wall |
2004 |
| Duke Energy (Cinergy) | Wabash #2 |
USA |
113MW |
Reheater |
2005 |
| Duke Energy (Cinergy) | Cayuga#2 |
USA |
512MW |
Superheater |
2005 |
| Duke Energy (Cinergy) | Cayuga#2 |
USA |
512MW |
Economizer |
2005 |
| APS | Four Corner #3 |
USA |
800MW |
RH, PSH, HRA |
2005 |
| AEP | Mountaineer |
USA |
1300MW |
SSH |
2005 |
| Pacific Fujian | Meizhou Wan |
China |
396MW |
Panel |
2005 |
| Fortum | Liaohe |
China |
- |
Panel |
2005 |
| HKE | HKE #4, #5 |
Hong Kong |
- |
Bend Tube |
2005 |
| HKE | HKE #4, #5 |
Hong Kong |
- |
RH |
2006 |
| Duke Energy (Cinergy) | Gibson #2 |
USA |
660MW |
SH Pendant |
2006 |
| Duke Energy (Cinergy) | Gibson #2 |
USA |
660MW |
FSH |
2006 |
| AEP | Rockport #2 |
USA |
1300MW |
SSH |
2006 |
| AEP | Gavin #2 |
USA |
1300MW |
SSH |
2006 |
| AEP | Gavin #2 |
USA |
1300MW |
RH |
2006 |
| GRDA | GRDA #2 |
USA |
490MW |
RH Coil |
2006 |
| Duke Energy (Cinergy) | Gallagher |
USA |
150MW |
RH Coil |
2006 |
| AEP | Philip Sporn #2 |
USA |
- |
SSH |
2006 |
| Duke Energy (Cinergy) | Miami Fort #8 |
USA |
558MW |
RH Pendant |
2006 |
| AEP | Mitchell #1 |
USA |
800mw |
RH |
2006 |
| Duke Energy (Cinergy) | Gallagher #2 |
USA |
150MW |
SH |
2006 |
| Fortum | Liaohe |
China |
- |
Panel, Tube, Coil |
2006 |
| Ameren | Coffeen #2 |
USA |
617MW |
Cyclone |
2006 |
| Ameren | Coffeen #2 |
USA |
617MW |
RET & Wall |
2007 |
| Duke Energy | Gallagher #2, #3, #4 |
USA |
150MW |
RH |
2007 |
| Duke Energy | Gibson #5 |
USA |
660MW |
RH |
2007 |
| Duke Energy | Miami Fort #7 |
USA |
558MW |
RH |
2007 |
| Duke Energy | Cayuga#1 |
USA |
300MW |
RH |
2007 |
| AEP | Amos #1, #2 |
USA |
1300MW |
RH |
2007 |
| Duke Energy | Belews Creek #1 |
USA |
1200MW |
RH |
2007 |
| PPL | Montour #1 |
USA |
800MW |
FSH |
2007 |
| Duke Energy | Gallagher #4 |
USA |
150MW |
SH |
2007 |
| Duke Energy | Buckstation #5, #6 |
USA |
256MW |
SH |
2007 |
| Xcel Energy | Pawnee |
USA |
500MW |
SH, HRA |
2007 |
| Labuhan | Angin |
Indonesia |
420T/Hr |
Tube, Coil |
2007 |
| Duke Energy | Cayuga电厂#2 |
USA |
512MW |
RH |
2008 |
| Ameren | Coffeen #1 |
USA |
389MW |
Cyclone |
2008 |
| Ameren | Coffeen #1 |
USA |
389MW |
RET, WW |
2008 |
| Nipsco | Bailly #8 |
USA |
422MW |
Cyclone, RET & Wall |
2008 |
| Duke Energy | Belews Creek #2 |
USA |
1200MW |
RH |
2008 |
| FPL | Manatee /Martin #1 |
USA |
150MW |
FSH |
2008 |
| Duke Energy | Gallagher #1 |
USA |
150MW |
SH |
2008 |
| Sinopec | GPC |
China |
420T/Hr |
FSH |
2008 |
| FPL | Manatee #2 |
USA |
150MW |
FSH |
2008 |
| FPL | Martin #2 |
USA |
150MW |
FSH |
2008 |
| FPL | Manatee #1 |
USA |
150MW |
FSH |
2009 |
| Duke Energy | Allen #5 |
USA |
- |
SH, RH |
2009 |
| Duke Energy | Gallagher #3 |
USA |
150MW |
SH |
2009 |
| Duke Energy | Cliffside #5 |
USA |
600MW |
RH |
2009 |
| KCPL | LaCygne #1 |
USA |
894MW |
Cyclone, RET & Wall |
2009 |
| Nipsco | Bailly #8 |
USA |
422MW |
SSH, RH |
2009 |
| Pacificorp | Hunter #1 |
USA |
415MW |
LTSH |
2009 |
| Pacificorp | Hunter #2 |
USA |
415MW |
LTSH |
2009 |
| Duke Energy | Miami Fort #8 |
USA |
558MW |
SSH |
2009 |
| Pacificorp | Dave Johnson #3 |
USA |
762MW |
Burner Panel |
2009 |
| Reliant Energy | Avon Lake #9 |
USA |
- |
SSH |
2009 |
| NV Energy | Valmy #2 |
USA |
250MW |
RH |
2009 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
Panel |
2009 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
PSH, HRA |
2009 |
| Duke Energy | Miami Fort #7 |
USA |
558MW |
Wrap & DMW Tube |
2009 |
| PPL | Montour #1 |
USA |
800MW |
FSH |
2010 |
| AECI | Thomas Hill |
USA |
670MW |
RH |
2010 |
| Duke Energy | Zimmer |
USA |
1300MW |
RH |
2010 |
| Duke Energy | Zimmer |
USA |
1300MW |
SSH |
2010 |
| Duke Energy | Gibson #3 |
USA |
630MW |
RH |
2010 |
| Duke Energy | Miami Fort #7 |
USA |
558MW |
RH |
2010 |
| Duke Energy | Gibson #5 |
USA |
660MW |
Furnance Panel |
2010 |
| NV Energy | Reid Gardner #1,#2 |
USA |
100MW |
SH, RH |
2010 |
| Empresa Generadora | Itabo |
Dominican |
- |
RH, HRA |
2010 |
| Fuel Tech | Fuel Tech |
USA |
- |
Furnace RW Panel |
2010 |
| Labuhan | Angin |
Indonesia |
420T/Hr |
Furnace Panel |
2010 |
| HENC | GP |
Korea |
250T/Hr |
Furance Wall |
2010 |
| Duke Energy | Gibson #2 |
USA |
660MW |
Test Panel |
2010 |
| NRG Energy | Homer City #2 |
USA |
630MW |
FSH |
2010 |
| KCPL | LaCygne #1 |
USA |
894MW |
16 pcs Rolled Tube |
2011 |
| Duke Energy | Gibson #3 |
USA |
630MW |
Overlay Panel |
2011 |
| Duke Energy | Gibson #3 |
USA |
630MW |
Scaffold Opening |
2011 |
| Entergy | Little Gypsy #3 |
USA |
350MW |
RH |
2011 |
| Entergy | Lewis Creek #1, #2 |
USA |
260MW |
Horizotal RH, SSH |
2011 |
| PPL | Brunner Island #3 |
USA |
800MW |
SH Platen Pendant |
2011 |
| Big River | DB Wilson |
USA |
440MW |
FSH |
2011 |
| Duke Energy | Gibson #2 |
USA |
660MW |
Furnace Panel, RH |
2011 |
| Duke Energy | Gibson #2 |
USA |
660MW |
Coil |
2011 |
| NV Energy | Reid Gardner #3 |
USA |
100MW |
RH, PW, WW |
2011 |
| NRG Energy | Homer City #1 |
USA |
630MW |
FSH |
2011 |
| Duke Energy | Gibson |
USA |
- |
Overlay Tube |
2011 |
| Big River | Coleman #1 |
USA |
150MW |
RH |
2011 |
| AECI | Thomas Hill #3 |
USA |
- |
Furnace |
2011 |
| AEP | Amos #2 |
USA |
1300MW |
FSH, Inlet /Outlet HD |
2011 |
| Duke Energy | Belews Creek #2 |
USA |
1200MW |
Sidewall Panel, Metal Spray |
2011 |
| Duke Energy | - |
USA |
- |
Overlay Tube |
2011 |
| Duke Energy | - |
USA |
- |
Opening w/ Wall box |
2011 |
| Hanwha Energy | Hanwha |
Korea |
420T/Hr |
Furnace Panel |
2011 |
| FWST | - |
Thailand |
- |
Overlay Tube |
2011 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
Furnace Wall |
2011 |
| AEP | Amos #1 |
USA |
1300MW |
FSH, Inlet /Outlet HD |
2012 |
| PSNH | Merrimack #2 |
USA |
337MW |
Cyclone, RET & Wall |
2012 |
| PSNH | Merrimack #2 |
USA |
337MW |
RH, SH |
2012 |
| PSNM | San Juan #1 |
USA |
340MW |
RH |
2012 |
| Duke Energy | Gibson #4 |
USA |
660MW |
FSH, HD, RH |
2012 |
| Ameren | Sioux #2 |
USA |
525MW |
Furnace, WW |
2012 |
| SunCoke | Haver Hill |
USA |
- |
Overlay Tube |
2012 |
| Duke Energy | Gibson #1 |
USA |
630MW |
Front Wall |
2012 |
| KCPL | LaCygne #1 |
USA |
894MW |
17 pcs Rolled Tubes |
2013 |
| KCPL | LaCygne #1 |
USA |
894MW |
216 pcs Rolled/ Bent Tubes |
2013 |
| Duke Energy | East Bend |
USA |
669MW |
RH |
2013 |
| Xcel Energy | Pawnee #1 |
USA |
505MW |
DW, FSH, HD |
2013 |
| Pacificorp | Hunter #1 |
USA |
415MW |
FSH, FSOH |
2013 |
| Duke Energy | East Bend #2 |
USA |
669MW |
SSH Coil |
2013 |
| Duke Energy | East Bend #2 |
USA |
669MW |
Roof Tube |
2013 |
| SCPC | Calaca #1 |
Philippines |
300MW |
Outlet HD |
2013 |
| Sinopec | GPC |
China |
420T/Hr |
Bent Fin Tube |
2013 |
| SCPC | Calaca #1 |
Philippines |
300MW |
Bent Tube |
2013 |
| Sinopec | Qingdao |
China |
310T/Hr |
Front Wall Panel |
2013 |
| AES | Masinloc #1, #2 |
Philippines |
300MW |
Spray Desuperheater |
2013 |
| Entergy | Ninemile #5 |
USA |
895MW |
RH Coil, HD |
2013 |
| Duke Energy | Marshall #4 |
USA |
658MW |
Furnace WW |
2013 |
| Duke Energy | Cayuga#1&2 |
USA |
1300MW |
FSH |
2013 |
| Duke Energy | Gibson #4 |
USA |
660MW |
Furnace Front Wall |
2013 |
| Duke Energy | Gibson #3 |
USA |
630MW |
FSH |
2013 |
| Duke Energy | Marshall #2 |
USA |
380MW |
Furnace Panel |
2013 |
| Duke Energy | Gibson |
USA |
- |
Panel |
2013 |
| Duke Energy | Gibson #3 |
USA |
630MW |
Furnace Wall Panel |
2014 |
| Hubco | Hubco |
Pakistan |
323MW |
FSH Coil, RH Tube |
2014 |
| Duke Energy | Marshall #4 |
USA |
658MW |
Loop |
2014 |
| SCPC | Calaca #1 |
Philippines |
300MW |
RH HD |
2014 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
Panel |
2014 |
| Duke Energy | Gibson #5 |
USA |
660MW |
RH |
2014 |
| Riikinvoima | Riikinvoima |
Finland |
- |
Intrex SH Overlay |
2014 |
| Longview | Longview |
USA |
730MW |
Furnace Panel |
2014 |
| Duke Energy | Roxboro |
USA |
707MW |
HD |
2014 |
| PSNM | San Juan #1 |
USA |
340MW |
FSH Bottom Loop |
2014 |
| Ameren | Sioux #1 |
USA |
525MW |
WW |
2014 |
| Duke Energy | Gibson #1 |
USA |
630MW |
SH Pendant, HD |
2014 |
| Mid American | Walter Scott #3 |
USA |
- |
SSH, WW |
2014 |
| Duke Energy | Gibson #1 |
USA |
630MW |
RH |
2015 |
| KCPL | LaCygne #1 |
USA |
894MW |
RET Bent Tube |
2014 |
| PSNH | Schiller |
USA |
- |
HD |
2015 |
| Duke Energy | Roxboro |
USA |
707MW |
PSH Coil, RH Coil |
2015 |
| NRG Energy | Homer City #2 |
USA |
630MW |
Panel |
2015 |
| SCPC | Calaca #2 |
Philippines |
512MW |
Burner Opening |
2015 |
| Duke Energy | - |
USA |
- |
Panel |
2015 |
| Hubco | Hubco #1 |
Pakistan |
323MW |
FSH Tube, SSH Coil |
2015 |
| SCPC | Calaca #1 |
Philippines |
300MW |
Opening |
2015 |
| SHI | NKA |
Japan |
77T/Hr |
PSH, SSH, Intrex SH |
2015 |
| Nipsco | Schahfer #15 |
USA |
515MW |
FSH Pendant, Econ HD |
2015 |
| KCPL | LaCygne #1 |
USA |
894MW |
106 pcs Rolled Tubes |
2015 |
| NRG Energy | Homer City #1 |
USA |
630MW |
Panel, Bent Tube |
2015 |
| NRG Energy | Homer City #1 |
USA |
630MW |
Overlay Tube |
2015 |
| NRG Energy | Homer City #1 |
USA |
630MW |
Burner Opening, Furnace Panel |
2015 |
| SCPC | Calaca #1 |
Philippines |
300MW |
Access Door |
2015 |
| SCPC | Calaca #2 |
Philippines |
512MW |
SB Opening |
2015 |
| SCPC | Calaca #1 |
Philippines |
300MW |
Finned Tube |
2015 |
| SHI | THK-UNV |
Japan |
- |
Test Module |
2015 |
| SCPC | Calaca #1 |
Philippines |
300MW |
Inner Sleeve |
2015 |
| SCPC | Calaca #1 |
Philippines |
300MW |
Shield Tube |
2015 |
| SCPC | Calaca #2 |
Philippines |
512MW |
Furnace Panel |
2015 |
| Glow | Glow #2 |
Thailand |
170MW |
Overlay Panel |
2015 |
| Sinopec | GPC #1, #2 |
China |
420T/Hr |
Fin Tube |
2015 |
| Xcel Energy | Sherburne #3 |
USA |
860MW |
Pendant of ISH, FSH, RH |
2016 |
| Duke Energy | East Bend #2 |
USA |
669MW |
RH Bent Tube |
2016 |
| Duke Energy | Gibson #2 |
USA |
660MW |
Furnace Wall, Overlay Panel |
2016 |
| Sinopec | Wuhan |
China |
360T/Hr |
Furnace Panel |
2016 |
| Georgia Pacific | Savannah #3 |
USA |
45MW |
Furnace Panel |
2016 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
Furnace Opening w/ Box |
2016 |
| SHI | DO II |
Japan |
200T/Hr |
Intrex Panel, Bent Tube |
2016 |
| Duke Energy | Marshall #1 |
USA |
380MW |
Furnace Overlay Panel |
2016 |
| Duke Energy | Gibson #2 |
USA |
660MW |
Furnace Overlay Panel |
2016 |
| SCPC | Calaca #1 |
Philippines |
300MW |
FSH Overlay Consumable |
2016 |
| SCPC | Calaca #1 |
Philippines |
300MW |
HRA HD |
2016 |
| Dominion Energy | VCHEC |
USA |
300MW |
Air Nozzle Assembly |
2016 |
| Quezon | Quezon |
Philippines |
300MW |
Partial RH |
2016 |
| Dynegy | Miami Fort #7 |
USA |
550MW |
FSH Pendant Assembly |
2016 |
| Bacalod | Bacalod |
Philippines |
40MW |
Spray HD |
2016 |
| SCPC | Calaca #1 |
Philippines |
300MW |
Spare Part of FSH, Furnace, HRA, RH |
2016 |
| Duke Energy | Gibson #3 |
USA |
630MW |
Furnace WW |
2016 |
| SCPC | Calaca#2 |
Philippines |
300MW |
RH |
2016 |
| SCPC | Calaca #1 |
Philippines |
300MW |
Spare Part of Furnace, HRA, FSH |
2016 |
| Hanwha Energy | Gunsan#1 |
Korea |
250T/Hr |
Spray HD |
2016 |
| Pourin | Shenneng Wuhan |
China |
40T/Hr |
SH |
2016 |
| Quezon | Quezon |
Philippines |
300MW |
RH |
2016 |
| SM200 | SM-200 |
Philippines |
- |
Tube |
2016 |
| SCPC | Calaca #1 |
Philippines |
300MW |
Bent Tube |
2016 |
| Sinopec | Wuhan |
China |
360T/Hr |
Furnace WOL Panel |
2016 |
| Sinopec | Jiujiang |
China |
220T/Hr |
Furnace WOL Panel |
2016 |
| Sinopec | Jiujiang |
China |
220T/Hr |
Furnace WOL Panel |
2016 |
| CIMS | Whitecourt |
Canada |
- |
Evap. , PSH, SSH |
2016 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
Furnace WOL Panel |
2016 |
| SEC | SM200 |
Philippines |
- |
Panel |
2016 |
| SHI | SOK |
Japan |
230T/Hr |
Primary Desuperheater |
2017 |
| Entergy | NISCO #1, #2 |
USA |
- |
Wing Wall |
2017 |
| Duke Energy | East Bend #2 |
USA |
669MW |
SSH Outlet HD, Econ |
2017 |
| Sinopec | MMPC #2 |
China |
310T/Hr |
Spray HD, WOL Tube |
2017 |
| CLP | CLP |
Hong Kong |
- |
Finned Tube, Bent Tube |
2017 |
| SHI | SOK |
Japan |
230T/Hr |
Superheater Coil, Hanger Tube |
2017 |
| Sinopec | Wuhan |
China |
360T/Hr |
Panel |
2017 |
| Sinopec | Wuhan |
China |
360T/Hr |
Plate |
2017 |
| Glow | Glow |
Thailand |
115MW |
Overlay Kick-out Panel |
2017 |
| Alto Daelim | SM200 |
Philippines |
100MW |
Panel |
2017 |
| CLP | CLP |
Hong Kong |
- |
Finned Tube, Bent Tube |
2017 |
| Duke Energy | East Bend #2 |
USA |
630MW |
Partial SSH Pendant |
2017 |
| PSNM | San Juan Station Unit#1 |
USA |
361MW |
Header & Panel |
2017 |
| Sinopec | Jinshan |
China |
310T/Hr |
Economizer Retrofit |
2017 |
| KBP | KBP |
Japan |
33MW |
Intrex SH |
2017 |
| Quezon | Quezon #3 |
Philippines |
- |
RH Dogleg |
2017 |
| Southwest Luzon | Southwest Luzon |
Philippines |
2X150MW |
SH Panel |
2017 |
| Southwest Luzon | Southwest Luzon |
Philippines |
- |
Opening |
2017 |
| JEA | JEA |
USA |
298MW |
Arrow head air nozzle |
2017 |
| Dominion Energy | Dominion Energy |
USA |
585MW |
Arrow head air nozzle |
2017 |
| CLECO | Madison |
USA |
660MW |
Air Nozzle Assembly |
2017 |
| Alto Daelim SM200 | SM200 |
Philippines |
410T/Hr |
Spare Part |
2017 |
| KKO | KKO |
Japan |
- |
Cooling Pipe |
2017 |
| Sinopec | GPC |
China |
420T/Hr |
Tube |
2017 |
| Hubco Power | Hubco Power |
Pakistan |
323MW |
Plate, pipe, round bar |
2017 |
| NRG Energy | Homer City |
USA |
630MW |
Burner opening panel |
2018 |
| Dynegy | Dynegy Edwards#3 |
USA |
350MW |
RH Dogleg coil |
2018 |
| Sinopec | Wuhan |
China |
360T/Hr |
Tube, panel |
2018 |
| Keylakes | Marine Boiler |
USA |
- |
Gill Ring, U bend |
2017 |
| Sinopec | MMPC #2 |
China |
310T/Hr |
Tube, fin |
2018 |
| Pourin | DP CleanTech |
China |
130T/Hr |
Tube bending |
2018 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
Finned bending panel |
2018 |
| ESB | Moneypoint Station |
Ireland |
305MW |
Handcuff, support lug |
2018 |
| Duke Energy | Gibson #4 |
USA |
630MW |
Partial Division Wall |
2018 |
| Sinopec | MMPC #1 |
China |
2X410T/Hr |
Opening, panel, WOL tube |
2018 |
| NRG Energy | Bowline #2 |
USA |
567MW |
Burner Panel |
2018 |
| Yangcheng International | Yangcheng Plant #5 |
China |
350MW |
Division wall |
2018 |
| Sinopec | MMPC #2 |
China |
310T/Hr |
Connection pipe & elbow assembly, Header & nozzle assembly |
2018 |
| ENEL-EMGESA | Termozipa |
Colombia |
223MW |
Burner,OFA,classifier,opening |
2018 |
| Duke Energy | Gibson Station |
USA |
660MW |
Panel WOL |
2018 |
| Dapp Power LP | Marysville |
Canada |
25MW |
PSH coil, FSH coil |
2018 |
| Dominion Energy | Dominion Energy |
USA |
- |
Air nozzle casting |
2018 |
| Xcel Energy | Bay Front #1 |
USA |
- |
Economizer coil & header |
2018 |
| Duke Energy | Gibson Station |
USA |
770MW |
Panel WOL |
2018 |
| Sinopec | GPC |
China |
420T/Hr |
Finned tube |
2018 |
| Sinopec | MMPC #2 |
China |
310T/Hr |
Finned tube WOL |
2018 |
| NRG Energy | Homer City |
USA |
660MW |
Wall panel mixing sections |
2018 |
| Ruiding Waste Disposal | - |
Macao |
36T/Hr |
Tube bending |
2018 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
Finned tube WOL |
2018 |
| Duke Energy | Gibson Station |
USA |
770MW |
Panel WOL |
2019 |
| SCPC | Calaca #2 |
Philippines |
512MW |
Coils and panels |
2019 |
| SHIFWNA | Bay Shore#1 |
USA |
136MW |
Partial FSH |
2019 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
WOL Tube, Straight panel, Bent panel |
2019 |
| Pourin | - |
China |
- |
WOL tube bending and hot squeeze |
2019 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
WOL Tube |
2019 |
| Duke Energy | Bibson Station #3 |
USA |
660MW |
1 pc WOL panel |
2019 |
| SCPC | Calaca #2 |
Philippines |
512MW |
Tube bending |
2019 |
| Duke Energy | Bibson Station #3 |
USA |
660MW |
15pcs WOL tubes |
2019 |
| Xcel Energy | Bay Front #1 |
USA |
- |
Economizer coil, Header |
2019 |
| Quezon | Quezon |
Philippines |
300MW |
Reheater coil |
2019 |
| BLCP | Rayong |
Thailand |
717 MW |
Panel |
2019 |
| Dominion Energy | Dominion Energy |
USA |
300 MW |
Air Nozzle |
2019 |
| Sinopec | GPC |
China |
420T/Hr |
Finned tube |
2019 |
| Westrock Southeast | Dublin |
USA |
- |
Header, Panel |
2019, 2020 |
| Quezon | Mauban |
Philippines |
460MW |
Access Door |
2019, 2020 |
| Duke Energy | Gibson #3 |
USA |
630MW |
WOL panel |
2019 |
| Dominion Energy | Dominion Energy |
USA |
300 MW |
Air Nozzle |
2019 |
| Duke Energy | Gibson #3 |
USA |
630MW |
Opening and wall box |
2019, 2020 |
| Duke Energy | Gibson #3 |
USA |
630MW |
WOL panel |
2019 |
| Samcheok | Samcheok |
Korea |
4x550MW |
SH,RH |
2020 |
| Duke Energy | Gibson #3 |
USA |
630MW |
WOL panel |
2020 |
| NSH | - |
Japan |
- |
Outlet header |
2020 |
| KCPL | La Cygne Unit #1 |
USA |
894MW |
Rolled Tube |
2020 |
| Samcheok | Samcheok |
Korea |
4x550MW |
RH |
2020 |
| GBP | Cebu |
Philippines |
246MW |
Panel |
2019, 2020 |
| Pourin | Mill Creek, Unit#4 |
USA |
- |
Tube bending,Hot squeeze |
2019 |
| GEP | GEP |
China |
400 T/Hr |
Desuperheater |
2020 |
| Duke Energy | Gibson #4 |
USA |
622MW |
Platen SH & Inlet Header |
2020 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
Bending Fin-Tube |
2020 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
Spray header |
2020 |
| EVN | Thai Binh |
Vietnam |
300MW |
Tube, Plate bar, Bended tube |
2020 |
| KKO | KKO |
Japan |
30T/hr |
Panel, Tube |
2020 |
| DELTA | Thai Binh |
Vietnam |
300MW |
Bent tube |
2020 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
Panel, Tube |
2020 |
| Pourin | Hailuo |
China |
500T/Hr |
VRB tube, Swage tube |
2020 |
| Duke Energy | Gibson #3 |
USA |
630MW |
WOL panel |
2020 |
| Quezon | Quezon |
Philippines |
480MW |
sleeve tube/ H clip/ handcuff |
2020 |
| DMCI holdings Inc | Calaca #2 |
Philippines |
512MW |
Tube |
2020 |
| Seagull | SGC / Gunjang Energy4 |
Korea |
790T/Hr |
Wing Wall, Opening, Piping |
2021 |
| West Rock | West Rock |
USA |
- |
Spray headers |
2021 |
| Dominion Energy | Dominion Energy |
USA |
- |
Air Nozzle Assemblies |
2021 |
| Pourin | Wheelabrator |
USA |
- |
Tube end swage |
2021 |
| Pourin | Wheelabrator |
USA |
- |
Swage Tube |
2021 |
| Duke Energy | Gibson #4 |
USA |
660MW |
WOL Panel, WOL Tube |
2021 |
| Duke Energy | Gibson #3 |
USA |
630MW |
Panel |
2021 |
| Pourin | Yisheng #1 |
China |
410T/H |
Tube end swage |
2021 |
| Dominion Energy | Dominion Energy |
USA |
- |
Air nozzle |
2021 |
| Duke Energy | Gibson #1/#2 |
USA |
630MW/660MW |
Panel |
2022 |
| Samcheok | Samcheok |
Korea |
550MW |
Intrex SH, Intrex RH |
2022 |
| Hangzhou Boiler | - |
UK |
2*1000T/D |
Swage Tube |
2022 |
| KCPL | Lacygne |
USA |
894MW |
Throat Tube |
2022 |
| Enefit Auvere | Enefit Auvere FBHE |
Estonia |
305MW |
Superheater, Reheater |
2022 |
| Pourin | - |
Thailand |
350T/D |
Tube bend squeeze |
2022 |
| EVN | Thai Binh |
Vietnam |
300MW |
Burner assembly |
2022 |
| Pourin | Calaca #1 |
Philippines |
300MW |
Tube end swage |
2022 |
| Rio Tinto | Kennecott Utah Copper Smelter |
USA |
60000 m3n/h |
Tube, Pipe |
2022 |
| Genbsan Etec GE-4 | Etec Seagull power plant |
Korea |
300MW |
Panel, Opening, Joint |
2023 |
| Pourin | - |
UK |
- |
Tube VRB Bend |
2022 |
| Enefit Auvere | Enefit Auvere FBHE |
Estonia |
305MW |
SH, RH, Header, Pipe |
2023 |
| Sinopec | Tianjin |
China |
3*420T/hr |
SH, Evaporator, Panel, Piping |
2023 |
| JEA | JEA |
USA |
298MW |
Nozzle, Pipe, Pin |
2023 |
| Kuopion Energia |
Kuopion |
Finland |
- |
SHI, SHII & SHIII |
2023, 2024 |
| Heinola PR2 |
Heinola |
Finland |
- |
Furnace, Economizer |
2023, 2024 |
| SBE | SBE |
Japan |
75MW |
PRH |
2023 |
| Pourin | - |
Chile |
- |
Bend Tube, Tube |
2023 |
| Sinopec | GPC |
China |
420T/Hr |
Finned Tube |
2023 |
| Pourin | Trimble County Unit 1 |
USA |
- |
Solution Annealing for Bent Tube |
2023 |
| Pourin | Hailuo |
China |
500 T/Hr |
Swage Tube, Flux |
2023 |
| OGT | OGT |
Japan |
255T/Hr |
RH |
2023 |
| Duke Energy | Gibson #2 |
USA |
660MW |
SH |
2023, 2024 |
| MBPG | MBPG |
Japan |
240T/Hr |
PRH |
2023, 2024 |
| MBPG | MBPG |
Japan |
240T/Hr |
Tube Bending |
2023 |
| SV liksenvaara |
Liksenvaara |
Finland |
- |
SH |
2023, 2024 |
| Hanwha Energy | Hanwha G-2 |
Korea |
- |
HT for T91 coils, Plate |
2023 |
| Stora Enso | - |
Sweden |
- |
Bended Tube |
2023, 2024 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
Tube |
2024 |
| Hanwha Energy | Hanwha G-2 |
Korea |
- |
Economizer, Superheater etc. |
2024, 2025 |
| Nippon Steel Engineering | NEH |
Japan |
245T/Hr |
Protector, Band |
2024 |
| KCPL | Lacygne Generating Station |
USA |
- |
Throat Tube |
2024 |
| Hanwha Energy | Gunsan |
Korea |
2 x 250T/Hr |
Panel |
2024 |
| Sinopec | Zhenhai |
China |
2 x 410T/Hr |
Economizer |
2024 |
| BioPower KANDA | KDK |
Japan |
75MW |
PRH |
2024 |
| Sinopec | MMPC #2 |
China |
310T/Hr |
EVWW |
2024 |
| SFWST | Therma Visayas |
Philippines |
- |
Plate Assembly |
2024 |
| Pourin | Cayuga Generating Station Unit 1 |
USA |
- |
Bent Tube Solution Annealing |
2024 |
| JEA | JEA |
USA |
298MW |
Grid Nozzle, Cotter Pin, Sleeve Pipe |
2024 |
| Takasago Seishi Co., Ltd |
TPI |
Japan |
65t/h, 11.4MW |
Economizer, Tube |
2024, 2025 |
| Savon Voima Oyj, Iisalmi | SV lisalmi |
Finland |
- |
Superheater |
2024, 2025 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
Tube |
2024 |
| TBSII | TBSII |
Singapore |
450T/Hr |
Protector, Casting |
2024 |
| Sinopec | MMPC #1 |
China |
410T/Hr |
Evaporator wing wall panel |
2024, 2025 |
| PoSeung Green Power Co.,Ltd | PoSeung |
Korea |
180T/Hr |
Cross Over Duct, Economizer |
2024, 2025 |
| Hunosa La Pereda | Unit 1, timepoint 2 |
Spain |
50MW |
Wall Partial, Intrex Chamber,Superheater |
2025 |
| GS EPS | GS DJ#1 |
Korea |
105MW |
Intrex Superheater Module |
2025 |
| GS EPS | GS DJ#2 |
Korea |
105MW |
Intrex Superheater Module |
2025 |