ECON, SH, etc Boiler Replacements for Korea

05-05-2025


This is the South Korea Hanwha G2 Project, with the end user being Hanwha Energy Corporation. In this project, we were responsible for manufacturing boiler replacement parts including Economizer II, Primary Superheater, Furnace Grid, Convection Cage, Hanger tubes, Code Piping and Return Leg Opening. The products were produced from May 2024 to March 2025 and successfully shipped via Xinhui Port International Terminal in May 2025, eventually arriving at the project site in South Korea.



See more news